News Archive

NG10. The latest update 27 Sept

Published and found at

The whistle has now been fitted at the front of the cab, this is a modified version of an SAR type to produce a more “American” style sound.

Our general pictures show the clack boxes that have  been fitted to the boiler and work continues with piping.

A lot of detail work is still needed before the first steam test expected in December plus the final assembly of the tender with the fitment of the tank to the newly built tender frame.

Read the full article