News Archive

The tubes are prepared for NGG16 Number 113

Published and found at

The boiler tubes have now been swaged and annealed ready for fitment into the boiler of number 113.

Our pictures show the tubes being swaged and then annealed and cooled by being covered with clean sand.

Read the full article