Autumn Outdoor Week 2009 - Achievements!
break->
WHARF
Weigh house now ready up to roof level – rafters ready for boarding. (Museum to fund slates).
PENDRE
North Shed rewiring progressing well – ongoing.
HENDY BRIDGE AREA
Deeper drain provided to remove excess water coming off the farmers field.
CYNFAL BANK
Bottom section tamped with Matisa.
CYNFAL STREAM
Checked for flooding – needs downstream section on Cynfal farms land lowering.
BRYNGLAS WEST TURNOUT
Old one removed new one installed and mainline road made runable – First 60ft of loop needs re-railing and re-sleepering, stretcher bar and S&T work.
Engineering support from Pendre much appreciated.
4 ¼ MILEPOST TO MILEPOST 6
Much of the backlog of important tamping carried out by Matisa.
4 ¼ MILEPOST AREA
Hedge laying and removal of arisings – ongoing.
4 ¾ MILEPOST AREA
South side drain dug through part of cutting West of Viaduct.
QUARRY SIDING BURN SITE
Fuller than it has been for a long time.
MILEPOST 6 TO NANT GWERNOL
• Drainage work
• Removal of vast quantities of leaves, most hampering routine line inspections.
ABERGNOLWYN AREA & AMEN CORNER
Tree trimming and thinning to remove dead or dying trees and branches. Boscage removed to Q.S. Firewood to Pendre.
AMEN CORNER
7 lengths re-sleepered and tamped – needs to consolidate before its given a final tamping.
GANG NUMBERS
236 people days in 2007, 248 in 2008 and 237 in 2009
Thanks to Keith Theobald for the details and pictures.
Source: Latest News