View Archive

Wharf Redevelopment - More recent Photographs

A further (large) selection of recent photographs of the Wharf Redevelopment.


Wharf Station

View along platform showing new edge slates in place.


Wharf Station

A wedding party waiting for their special train.


Wharf Station

A wedding party waiting for their special train.


Wharf Station

Platform scene.


Wharf Station

The Railway Shop, showing the temporary partition behind the books, and boarding where the platform doors used to be.


Wharf Station

Entrance steps, with boiler house on left.


Wharf Station

View from the shop/refreshment staff entrance.


Wharf Station

The boiler house. The “machine guns” sticking out of the wall are the vents.


Wharf Station

1st floor goods delivery entrance.


Wharf Station

Progress on the wing wall of the railway bridge.


Wharf Station

View from the new balcony.


Wharf Station

The balcony provides a grandstand view of the coal pile!


Wharf Station

JAVS points out the Cambrian Coast line.


Wharf Station

Still a lot of ground works to do at the entrance.


Wharf Station

The new removeable section of platform in front of the museum.


Wharf Station

The new guards room. The toilet is not yet in its final location!


Wharf Station

The new guards room looking out towards the Cambrian Coast line. The “dirty” toilet opens off the lobby on the left.


Wharf Station

Looking down the platform.


Wharf Station

The double platform doors from the shop have now been converted back to a single door.


Wharf Station

View from the other side of the Cambrian Coast line.


Wharf Station

Another view of the work on the bridge wing wall.


Wharf Station

The café with the servery to the right. The open door on the left leads to the lobby containing the lift and museum entrance.


Wharf Station

The other side of the shop partition, looking from the café.


Wharf Station

Looking in through the servery to the kitchen area.


Wharf Station

From the museum looking back towards the café area. The ramps into the museum have yet to be built, hence the current drop from the door.


Wharf Station

Looking out of the servery into the café showing the suspended ceiling with fluorescent lighting.


Wharf Station

View from the Managing Director’s office window (which has yet to be cleaned!).


Wharf Station

The MD’s other window enables him to keep an eye on the Cambrian Coast line too.


Wharf Station

The John Slater Education Room. The passageway on the left leads to the museum, the centre opening is the Curators office, and the open door leads to the lift and toilets.


Wharf Station

View of the top of the museum stairs, with the doors fronting Neptune Road.


Wharf Station

First floor of museum showing (l-r) stairs, door (behind pillar) to lift, toilets and offices, door to Curators office, door to the John Slater Education Room, door and window to the Awdry Study.


Wharf Station

Upstairs lobby showing (l-r) lift, ladies toilets, gents toilet, entrance to offices, and on the right is the door to the John Slater Education Room.


Wharf Station

The upstairs toilets have been tiled in a fetching shade of green.


Wharf Station

The café kitchen, showing on the left, ‘Ed’s Tardis’, otherwise known as the Catering Manager’s office, and the door through to the catering store, toilets, and staff stairs.


Wharf Station

The join between the old and new building, showing the existing shop on the left.


Source: Talyllyn Railway: Latest News

Posted by mark mullarkey on 1 November 2004

Random Photo
Click to view more details on this image

Schafbergbahn

 

Hosting NGH & Isengard costs me £20/month. Will you help me cover this cost?

Webrings
Rail Freight

 

Log in

username:

Password:


Don't have an account? Create one.

Site sponsored by Maple Design - please support them!